| Hard Rock Projects |
|
Consolidated Tin Mines Limited Hard Rock Projects are as follows The Gillian Project is the most advanced project in the wider Mount Garnet Project area. To date (as at February 2012) Consolidated Tin has drilled a total of 8,334 metres across 130 holes at the project and it has a JORC Measured Resource of 1.2 million tonnes @ 0.82% Sn. Read More... The Pinnacles Project is located within EPM 14185 just east of the town of Mount Garnet. To date (as at February 2012) the Company has drilled a total of 3,918 metres across 97 holes. The project has a total JORC Resource of 1.87 million tonnes @ average grade 0.41% Sn across three deposits (Wafer, Sniksa, Hartog). Read More... The Windermere Project consists of MDL application 381 on an area of 347 hectares. To date (as at February 2012) a total of 6,382 metres across 96 holes has been drilled, and at present has a JORC Indicated Resource of 401,500 tonnes @ 0.49% Sn confirmed over the Deadmans Gully part of the project area. Read More... The Never Can Tell Project is located in the northern area of EPM 14185, in the headwaters of Wyndham Creek that was worked for alluvial tin during the 1970s. Read More... The Jimbilly Project is located north of the Never Can Tell workings. A small hill was quarried in the 1960s and quartz veined granite with visible wolframite was exposed on one side of the hill. Read More... The Coolgarra group - includes the Alhambra Mine (430 tonnes tin concentrate production) and Magdala Mine (130 tonnes tin concentrate production). Read More... |
Hard Rock Projects