| Windermere/ Deadmans Gully Project Drilling Summary |
|
Summary of average grade across selected mineralised length.
Deadmans Gully Drill Holes are H24-H26
Hole 24 0-15 metres down hole 15 metres @ 0.24% Sn, 46.1% Fe"
15-19 metres down hole 4 metres @ 1.70% Sn, 36.5% Fe"
19-30 metres down hole 11 metres @ 0.47% Sn, 25.0% Fe"
Hole 25 0-33 metres down hole 22 metres @ 0.49% Sn, 37.5% Fe"
9-14 metres down hole 5 metres @ 0.34% Sn, 54.1% Fe"
Hole 26 7-14 metres down hole 7 metres @ 0.24% Sn, 34.2% Fe"
14-22 metres down hole 8 metres @ 0.47% Sn, 33.3% Fe"
22-24 metres down hole 2 metres @ 2.38% Sn, 22.3% Fe"
|